ROAD 90. KM=164.4
(HA'ARAVA ROAD. NORTH OF "HAZEVA")
COOR.(NEW) - 2247/5287
PICTURE 9
EROSION OF THE SOILY PART OF "H'AZEVA" FORMATION, AND
COLLAPSE OF THE CONGLOMERATIC PART.
BACK
TO
"EROSION"
NEXT
PIC.
(10)
BACK
PIC.
(8)
BACK
TO
"MAIN MENU"