ROAD 90. KM=244
WADI "ARUGOT" BRIDGE
COOR.(NEW) - 2378/5965
PICTURE  5

THE DESTRUCTION OF THE TEMPORARY BY-PASS OF WADI "ARUGOT"
AFTER THE FLOOD ON 04.12.2001

    BACK TO "EROSION"              NEXT PIC.(6)        BACK PIC.(4)
                                                         BACK TO "MAIN MENU"